PRIVATE LABELPRODUCTIONSYSTEM

Private label, built to specification.Every material, trim, and tolerance documented and verified. Built for teams that procure on specification.

30-min call·Costed plan in 5 business days

Branding options

BRANDING TECHNIQUES

3D PUFF EMBROIDERY

Up to 12k stitch · 6mm raise

High-density foam embroidery for sculpted logos. Tajima multi-head machinery. Ideal for caps, hoodies, and outerwear.

SCREEN PRINT · DTF · SUBLIMATION

240 DPI · CMYKW+OG · DTF film

Soft-hand plastisol, water-based discharge, direct-to-film (DTF) for short runs and stretch substrates, full-piece sublimation print-to-edge.

WOVEN & DAMASK LABELS

Up to 8 colors · ≥120 yarn count

Centre-fold, end-fold, manhattan-fold. Ultrasonic or hot-cut. Lead time 14 days for mill-direct production.

HANG TAGS & CARE LABELS

350 GSM · soy-based ink

Custom card stock with foil stamping, embossing, debossing. EU-compliant care labels in any language.

HARDWARE & TRIMS

Brass · zinc · custom plate

Engraved zipper pulls, drawcord stoppers, rivets, snap buttons, custom-plated hardware finishes.

HEAT TRANSFER & REFLECTIVE

PU film · 3M Scotchlite

Soft-hand HTV for stretch fabrics, retroreflective transfers for hi-vis workwear and night-visibility apparel.

Color

PANTONECONTROL.

PMS-matched dyehouse runs with lab-dip approval on every colorway. Garment-dyed and piece-dyed options available. Color is locked before production starts.

Tolerance per batch

ΔE ≤1.5

Maximum colour deviation across batches — below the threshold the eye can detect.

LD-01
LD-02
STD
PROD
WSH-A
WSH-B
REF
PMS
+PMS

Lab Dip 01

Lab Dip 02

Approved Std.

Production Match

Garment Wash

Piece Dyed

Reference

+ Custom PMS

01

LAB DIP

Up to 3 dye trials per shade.

02

BULK APPROVAL

Sign-off on strike-off before mill release.

03

PRODUCTION LOCK

Held to ΔE ≤ 1.5 across every batch.

Patterns

WHATEVER STAGEYOU'RE IN.

Submit a pattern file, a reference garment, or a technical sketch. Three structured entry points matched to your project stage.

Capability

  • XXS → 5XL grading
  • Pattern digitisation
  • PDF · DXF · AAMA formats
AEntry A

YOU SHIP THE PATTERN

PDF · DXF · AAMA. We digitise, true the lines, and grade XXS through 5XL against your fit standard.

BEntry B

YOU SHIP A REFERENCE

A garment you love. We deconstruct, draft a new pattern, and re-spec it to hit your fit, fabric, and tolerance.

CEntry C

WE DRAFT FROM SCRATCH

A sketch, a moodboard, or a verbal brief. Concept becomes tech pack becomes sealed sample — handled end to end.

Production lifecycle

FROM TECH PACK TO PALLET

A 45-day production cycle across six gated stages. Every transition requires a formal sign-off before work proceeds.

  1. 01 · Brief Intake

    BLUEPRINT, SKETCH, OR SAMPLE

    Ship a tech pack, a reference garment, or just a sketch and a brief — any starting point works. Our engineering desk converts it into a production-ready spec, so no guesswork carries forward.

    Day 0–3

  2. 02 · Sampling

    PROTO & SEALED SAMPLE

    First proto in 10–14 days. Up to two free revisions before sealed sample sign-off. Approval gate: every following stage references the sealed sample.

    Day 3–17

  3. 03 · Pre-Production Audit

    COMPONENT VERIFICATION

    Bulk fabric, trims, accessories, and branding components inspected against the sealed sample before cutting begins. Substitutions require explicit re-approval.

    Day 17–22

  4. 04 · Production

    CUT · SEW · BRAND

    Dedicated production lines. In-line QC every 100 units. Embroidery, print, and finishing run on synchronised stations to lock alignment tolerances.

    Day 22–40

  5. 05 · Final Inspection

    AQL 2.5 AUDIT

    Photographic record of every defect class. Optional third-party audit (SGS, Bureau Veritas, or your own inspector) before sign-off.

    Day 40–43

  6. 06 · Logistics

    CARTONISED DISPATCH

    Folded, polybagged, cartonised. Hungary or Spain origin, split-destination supported. Customs paperwork and EUR.1 included for EU shipments.

    Day 43–45

Hardware · Construction
Hardware

ENGINEEREDDETAIL.

Every closure, pull, and trim is specified to brand. Custom-tape zippers, plated pulls, and bespoke buttons sourced mill-direct.

YKK + MILL-DIRECT ZIPPERS

G-type · vislon · invisible

CUSTOM-COLOUR ZIPPER TAPE

Pantone matched dye

ENGRAVED & PLATED PULLS

Brass · gunmetal · custom plate

TWO-WAY · WATERPROOF ZIPPERS

AquaGuard · YKK 5VS

SNAPS · EYELETS · RIVETS

Spring · ring · capped

DRAWCORDS + TIPPING

Round · flat · metal-tipped

CUSTOM BUTTONS

Corozo · horn · metal · stamped

HANGTAGS + WOVEN TAPE

Foil · emboss · 4-color

Construction

Flatlock for performance, bartack at stress points, taped seams for waterproof shells. AQL 2.5 inspection conducted in-line at each stage.

SEWNTO SPEC.

  • DOUBLE-NEEDLE TOPSTITCH

    1/4" or 1/16" gauge

  • FLATLOCK SEAMS

    Athletic, no-chafe finish

  • COVERSTITCH HEM & CUFF

    3-needle, looper-secured

  • BARTACK REINFORCEMENT

    42-stitch at stress points

  • TAPED SEAMS

    Hot-air, waterproof shells

  • BLIND HEM · FRENCH · SERGED

    Selectable per construction

  • HEAVY-FABRIC CAPABILITY

    Denim · canvas · leather

  • AQL 2.5 IN-LINE QC

    Per-100-units sampling

Specification sheet

OPERATING PARAMETERS

The non-negotiables. These are the constants every quote, sample, and bulk run is built around.

Request Full Capabilities Dossier
01 · Min. Order100 units / SKU
02 · Sample Lead Time10–14 days
03 · Bulk Lead Time30–45 days
04 · Re-orders20 days
05 · Defect ToleranceAQL 2.5
06 · QC Stages3 (sample · pre-prod · final)
07 · Origin MillsHUTRES
08 · Dispatch HubsHUES

Specification Audit

SHIP US YOUR BLUEPRINTS.

Submit your tech pack, reference garment, or brand book. Our engineering desk will return a costed production plan within 5 business days.