
Barrel Kit Bag 50L
SKU: BAG-DUF-012
Full color range
Per-unit pricing is in the partner portal. Registration is immediate.
Not ready for an account? Order a sample · See the volume ladder
GARMENT OVERVIEW
A cylindrical barrel body at roughly 50 litres. The round section holds more than a flat-sided bag of the same footprint, which is why team kit and tool transport use it.
Construction
900 denier polyester with a full-length top zip, webbing grab handles stitched fully around the barrel body rather than to the panel alone, and a wipe-clean coated base. Cut in 100% polyester, coated base at 900D Polyester, in an approx. 50 litre fit graded across One size.
Specification
- Fabric: 100% Polyester, Coated Base, 900D Polyester
- Fit: Approx. 50 Litre
- Size run: One size
- Stock colours: Black, Navy, Olive
- Unit weight: approx. 980 g
- Care: Wipe clean with a damp cloth, do not machine wash, do not tumble dry
Who orders it
Team kit transport, trades and touring crew. Handles wrapped around the body is the load-bearing detail: handles stitched only to a panel tear out under a heavy load, which is the usual failure.
Branding
The barrel side takes a large screen print or a woven panel. Because the surface curves, keep artwork under 26 cm wide or the edges distort when the bag is packed full.
Ordering
From 100 units per colour. Heaviest denier in the range at 900D, so it costs more per metre and the price reflects material rather than construction complexity.
| Fabric Weight | 900D Polyester |
|---|---|
| Composition | 100% Polyester, Coated Base |
| Fit | Approx. 50 Litre |
| Size Range | One size |
| Construction | 900 denier polyester with a full-length top zip, webbing grab handles stitched fully around the barrel body rather than to the panel alone, and a wipe-clean coated base. |
| Unit Weight | 980 g |
| Packaging | Individually polybagged, carton quantities confirmed at order |
| Care | Wipe clean with a damp cloth, do not machine wash, do not tumble dry |
| Colors |
|
| Techniques |
|
Every order gets a confirmed production date before deposit, set at review against your volume and complexity. The date you approve is the date we commit to.

